Precision stacking equipment for lithium-ion prototype cells
Manual and automatic equipment stacks positive electrodes, negative electrodes, and separator rolls with selectable stacking and sealing configurations.
AI-assisted directory summary. Technical specifications, performance metrics, readiness and compliance labels are unverified unless individually supported and reviewed. Proposed partnership routes do not establish supplier consent, export eligibility, or willingness to sign an NDA. Confirm claims and test conditions with the linked sources and supplier before procurement or citation.
Problem solved
Reduces positional variation and operator burden during low-volume pouch-cell and lithium-ion prototype-cell assembly.
Application contexts
- Pouch-cell prototyping
- Separator and electrode stacking trials
- Low-volume cell assembly
Technical principle
Electrodes are supplied from stockers while separator material is roll-fed, cut to set lengths, and alternately stacked; three-head and four-head configurations use different separator handling and heat-sealing arrangements.
Typical use cases
- Pouch-cell stack assembly
- Separator-folding trials
- Repeatable prototype stacking
Partnership route
How global engineering teams typically engage this asset.
Helpful to include: electrode dimensions · separator width and thickness · target stack count · stack alignment tolerance · sealing method · desired automation level
Have specific parameters to run against this asset?
Submit a Challenge BriefProvider
Source & provenance
Translation review status: unreviewed. Publication does not establish technical verification or supplier endorsement.
Original language: JA.
Record updated: .
- 積層装置 | 組立装置
https://thank-metal.jp/products/assembly/laminating/
Primary-source candidate; evidence review: pending.
Source accessed / recorded (collector timestamp): .
Source publication date: Not recorded.
Collector timestamps record when a source was stored, not an independent verification date. Source links provide context; they do not validate every specification, readiness label, certification, or proposed partnership route.