NEWTEC Co., Ltd.
Sendai SME (est. 2001, capital ¥10M, 17 employees) specialized in injection-molded plastic magnets (bonded magnets) and two-shot in-mold integration of magnet and structural parts.
AI-assisted directory profile. Export readiness, certifications, technical claims and partnership preferences are unverified unless individually supported and reviewed. Listing does not establish supplier endorsement or willingness to enter an NDA. Confirm with the original sources and supplier before procurement or citation.
Core capabilities
- Injection molding of plastic magnets (ferrite or NdFeB powder in PA/PPS binders)
- Two-shot / insert molding that integrates magnet and surrounding structure in the mold
- Early-stage magnet-circuit design consultation to reduce sintered-magnet and rare-earth dependence
- Magnetization and magnetic evaluation for molded magnet parts
Related capability assets
Sequential or insert two-shot molding that joins a plastic-magnet shot to a structural resin or insert (shaft, gear, cover) inside the tool, removing a later adhesive assembly step.
Injection molding of ferrite or NdFeB powder in a thermoplastic binder (PA or PPS) to make bonded-magnet parts with 3D geometry, insert-molded shafts/gears, and no post-grind in the cases the company describes.
Source & provenance
Translation review status: unreviewed. Publication does not establish technical verification or supplier endorsement.
Record updated: .
- 会社情報 | 株式会社ニューテック
https://www.newtec-mag.co.jp/company
Primary-source candidate; evidence review: pending.
Source accessed / recorded (collector timestamp): .
Source publication date: Not recorded.
- プラマグ射出成形 | 株式会社ニューテック
https://www.newtec-mag.co.jp/tech01
Primary-source candidate; evidence review: pending.
Source accessed / recorded (collector timestamp): .
Source publication date: Not recorded.
- DuckDuckGo HTML: ボンド磁石 射出成形 株式会社
https://html.duckduckgo.com/html/?q=%E3%83%9C%E3%83%B3%E3%83%89%E7%A3%81%E7%9F%B3+%E5%B0%84%E5%87%BA%E6%88%90%E5%BD%A2+%E6%A0%AA%E5%BC%8F%E4%BC%9A%E7%A4%BE
Supporting / discovery source; evidence review: pending.
Source accessed / recorded (collector timestamp): .
Source publication date: Not recorded.
Collector timestamps record when a source was stored, not an independent verification date. Source links provide context; they do not validate every specification, readiness label, certification, or proposed partnership route.